Difference between revisions of "1996"

From WikiCU
Jump to: navigation, search
Line 3: Line 3:
 
*[[Ferris Booth Hall]] is demolished to make way for the new student center, [[Alfred Lerner Hall]]. Construction on Lerner would last until [[1999]]. Meanwhile, [[Lion's Court]] is erected to serve as the temporary student center, and stands until [[2002]].
 
*[[Ferris Booth Hall]] is demolished to make way for the new student center, [[Alfred Lerner Hall]]. Construction on Lerner would last until [[1999]]. Meanwhile, [[Lion's Court]] is erected to serve as the temporary student center, and stands until [[2002]].
 
*Students go on a hunger strike, occupying [[Low Library]] and [[Hamilton]] in the name of establishing an Ethnic Studies Department. In [[1999]], the [[Center for the Study of Ethnicity and Race]] is created in partial fulfillment of these demands.  
 
*Students go on a hunger strike, occupying [[Low Library]] and [[Hamilton]] in the name of establishing an Ethnic Studies Department. In [[1999]], the [[Center for the Study of Ethnicity and Race]] is created in partial fulfillment of these demands.  
 +
 +
{{succession|preceded=[[1995]]|succeeded=[[1997]]|office=History of Columbia University|years=1996}}
  
 
[[Category:20th century]]
 
[[Category:20th century]]

Revision as of 12:54, 5 April 2007

1996 in Columbia history:

Preceded by
1995
History of Columbia University 
1996
Succeeded by
1997